Standard Features:
- With the exception of our hawk series, all of our steam generators are built by an ASME Certificate holder in accordance with ASME BPVC Section I – Rules for Construction of Power Boilers (“ASME BPVC Section I”). They also comply with the requirements outlined in The National Board Synopsis of Boiler and Pressure Vessel Laws, Rules and Regulations (NB-370) RULES FOR CONSTRUCTION AND STAMPING section, which for many jurisdictions include but are not limited to ASME BPVC Section I, ASME CSD-1, ASME B31.1, and REGISTRATION WITH THE NATIONAL BOARD.
- Dual Pressure Controls (UL 353)
- Low Level Cut-Off (LLCO) (UL 353)
- Safety Relief Valve possessing the ASME V Mark (these valves are built by a manufacturer holding a valid ASME Certificate of Authorization)
- Steam Gun (33 ft Hose)
- Steam Tool Accessories Kit
Unit of Measure
Specifications
Brands |
N/A Electro-Steam™ |
Electrical Power |
N/A 20 kW |
Boiler Horse Power |
N/A 2 bhp |
Alternating Current (AC) Power Supply Voltage1 | N/A 208 V230 V380 V415 V440 V480 V600 V |
Phase |
N/A 3 |
Frequency |
N/A 50 Hz60 Hz |
Approximate Heat Up Time |
N/A 15 min |
Steam Capacity2 | N/A 69.00 lb/hr31.30 kg/hr |
Water Consumption |
N/A 8.27 gal/hr31.30 L/hr |
Gross British Thermal Units (BTU) Output |
N/A 66,951 Btu/hr |
Maximum Boiler Pressure |
N/A 200 psi |
Operating Pressure Range |
N/A 5 to 160 psi |
Operating Pressure (Factory Set Point) |
N/A 160 psi |
Boiler Temperature |
N/A 212 to 371 ºF |
Temperature at Tip |
N/A 212 ºF |
Maximum Boiler Capacity |
N/A 6 gal |
Boiler Fill Capacity |
N/A 4.2 gal |
Reservoir Tank Capacity |
N/A 7 gal |
Boiler Material 3 | N/A Carbon Steel |
Cabinet Material |
N/A 304 Stainless Steel |
Plumbing Material |
N/A Brass (Schedule 80) Carbon Steel (Schedule 80) |
Crated Weight |
N/A 725 lb |
Industry Standards |
N/A American Society of Mechanical Engineers (ASME) - CSD-1 Compliant American Society of Mechanical Engineers (ASME) - Miniature Boiler Code American Society of Mechanical Engineers (ASME) Section I - V-Stamp Underwriters Laboratories (UL 353) |
Cleaning Method |
N/A Dry Steam |
Amperage
Amperage at 208 VAC (3Ø Phase) |
N/A 55.5 A |
Amperage at 240 VAC (3Ø Phase) |
N/A 52.4 A |
Amperage at 380 VAC (3Ø Phase) |
N/A 30.4 A |
Amperage at 415 VAC (3Ø Phase) |
N/A 27.8 A |
Amperage at 440 VAC (3Ø Phase) |
N/A 26.2 A |
Amperage at 480 VAC (3Ø Phase) |
N/A 24.0 A |
Amperage at 600 VAC (3Ø Phase) |
N/A 19.2 A |
Included Options
- 1 Every Eagle Series electric steam generator is custom built to accommodate only one (1) specific three phase (3Ø) high voltage supply; the attached 25 foot (ft) flexible power cord (plug/socket not included) is sized according to the customer’s specified
- 2 Calculations are based off of a 212 ºF boiler feed-water temperature. Boiler feed-water temperatures that range between 60 ºF and 140 ºF, are approximately 80 % to 90 % of the calculated values shown. Boiler feed-water must not exceed 140 ºF.
- 3 Wetted Surfaces