Brands |
N/A Electro-Steam™ |
Electrical Power |
N/A 480 kW (120 kW per Box) (4 Boxes) |
Alternating Current (AC) Voltage1 | N/A 380 V415 V480 V600 V |
Phase |
N/A 3 |
Frequency |
N/A 50 Hz60 Hz |
Boiler Horse Power |
N/A 48 bhp (24 bhp per Boiler) |
Steam Capacity2 | N/A 1,656 lb/hr748.8 kg/hr |
Average Water Consumption3 | N/A 198.4 gal/hr748.8 L/hr |
Gross British Thermal Units (BTU) Output4 | N/A 1,606,656 Btu/hr |
Maximum Boiler Pressure |
N/A 100 psi |
Operating Pressure |
N/A 0 to 80 psi |
Note for Operating Pressure |
N/A Factory Set at 80 psi |
Maximum Boiler Capacity |
N/A 53 gal |
Note for Maximum Boiler Capacity |
N/A 26.5 Gallons per Boiler |
Boiler Fill Capacity |
N/A 44 gal |
Note for Boiler Fill Capacity |
N/A 22.0 Gallons per Boiler |
Boiler Material 5 | N/A Carbon Steel |
Cabinet Material |
N/A 304 Stainless Steel |
Plumbing Material6 | N/A Brass (Schedule 40) Carbon Steel (Schedule 40) |
Industry Standards |
N/A American Society of Mechanical Engineers (ASME) - Boiler and Pressure Vessel Code American Society of Mechanical Engineers (ASME) - CSD-1 Canadian Underwriters Laboratories (cUL) Underwriters Laboratories (UL) |
Amperage at 380 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) |
N/A 729.3 Amps (182.3 Amps per Box) (4 Boxes) |
Amperage at 415 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) |
N/A 667.8 Amps (166.9 Amps per Box) (4 Boxes) |
Amperage at 480 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) |
N/A 577.4 Amps (144.3 Amps per Box) (4 Boxes) |
Amperage at 600 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) |
N/A 461.9 Amps (115.5 Amps per Box) (4 Boxes) |
Water Inlet (Shared) |
N/A 1/2" NPT (Female) - Y-Strainer, Brass |
Steam Outlet (Shared) |
N/A 6" Flange (150 psi, 4-Hole) - 2-1/2" pipe connection |
Safety Valves (x2)(Separate) |
N/A 1-1/4" NPT (Male) (x2) - Two Black Pipes routed to the floor; one from each Safety Valve. |
Drain + MAFD Option (Shared) |
N/A 1" NPT (Female) - Elbow, Brass |
Steam Trap (Not Included) |
N/A 3/4" NPT (Female) - Threaded connection on the bottom of the 2-1/2" shared Steam Outlet pipe. |
Motorized Automatic Flush and Drain (MAFD) |
N/A Two of these options are supplied standard in all double stack steam generators; the motorized drain valve opens for three (3) minutes during every start-up. As old water is drained out, fresh water is cycled in. This drain valve will not open if the pressure in the steam generator exceeds 5 psi. The electric heaters are locked out during flush cycle. |
Single Service Transformer7 | N/A Two of these options are supplied standard in all double stack steam generators; the Transformer steps down the primary high voltage supplied for the heaters, in order to provide 120VAC 1Ø for the controls; with this option, only the two (2) primary high voltage supplies are required. |
Manual Low Water Reset8 | N/A Manual Low Water Reset trips if the electric heaters shut-off because of a low water condition. Reset must be manually pressed to resume steam production. |
Water Feed Booster Pump |
N/A Two Water Feed Booster Pumps are supplied standard in all high-pressure double stack steam generators. Each Water Feed Booster Pump increases the incoming water pressure to overcome the operating pressure of each steam generator. Each Booster Pump requires a 5-150 psi water supply with a minimum flow rate of 3 gpm (At least 6 gpm is required for both) |
Spare Parts Package Includes |
N/A
|
5-Micron Water Filter |
N/A 2-stage, 5-micron water filter installed into incoming water line to reduce sediment, dirt, rust, chlorine, and even odor from incoming water supply. |