Brands |
N/A Electro-Steam™ |
Electrical Power |
N/A 300 kW (75 kW per Box) (4 Boxes) |
Alternating Current (AC) Voltage1 | N/A 208 V230 V360 V400 V480 V600 V |
Phase |
N/A 3 |
Frequency |
N/A 50 Hz60 Hz |
Boiler Horse Power |
N/A 30 bhp (15 bhp per Boiler) |
Steam Capacity2 | N/A 1,035 lb/hr468.0 kg/hr |
Average Water Consumption3 | N/A 124.0 gal/hr468.0 L/hr |
Gross British Thermal Units (BTU) Output4 | N/A 1,004,160 Btu/hr |
Maximum Boiler Pressure |
N/A 100 psi |
Operating Pressure |
N/A 0 to 80 psi |
Note for Operating Pressure |
N/A Factory Set at 80 psi |
Maximum Boiler Capacity |
N/A 53 gal |
Note for Maximum Boiler Capacity |
N/A 26.5 Gallons per Boiler |
Boiler Fill Capacity |
N/A 44 gal |
Note for Boiler Fill Capacity |
N/A 22.0 Gallons per Boiler |
Boiler Material 5 | N/A Carbon Steel |
Cabinet Material |
N/A 304 Stainless Steel |
Plumbing Material6 | N/A Brass (Schedule 40) Carbon Steel (Schedule 40) |
Industry Standards |
N/A American Society of Mechanical Engineers (ASME) - Boiler and Pressure Vessel Code American Society of Mechanical Engineers (ASME) - CSD-1 Canadian Underwriters Laboratories (cUL) Underwriters Laboratories (UL) |
Amperage at 208 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) |
N/A 832.7 Amps (208.2 Amps per Box) (4 Boxes) |
Amperage at 230 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) |
N/A 785.8 Amps (196.5 Amps per Box) (4 Boxes) |
Amperage at 360 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) |
N/A 507.1 Amps (126.8 Amps per Box) (4 Boxes) |
Amperage at 400 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) |
N/A 452.9 Amps (113.2 Amps per Box) (4 Boxes) |
Amperage at 480 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) |
N/A 360.8 Amps (90.21 Amps per Box) (4 Boxes) |
Amperage at 600 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) |
N/A 288.7 Amps (72.17 Amps per Box) (4 Boxes) |
Water Inlet (Shared) |
N/A 1/2" NPT (Female) - Y-Strainer, Brass |
Steam Outlet (Shared) |
N/A 6" Flange (150 psi, 4-Hole) - 2-1/2" pipe connection |
Safety Valves (x2)(Separate) |
N/A 1-1/4" NPT (Male) (x2) - Two Black Pipes routed to the floor; one from each Safety Valve. |
Drain + MAFD Option (Shared) |
N/A 1" NPT (Female) - Elbow, Brass |
Steam Trap (Not Included) |
N/A 3/4" NPT (Female) - Threaded connection on the bottom of the 2-1/2" shared Steam Outlet pipe. |
Motorized Automatic Flush and Drain (MAFD) |
N/A Two of these options are supplied standard in all double stack steam generators; the motorized drain valve opens for three (3) minutes during every start-up. As old water is drained out, fresh water is cycled in. This drain valve will not open if the pressure in the steam generator exceeds 5 psi. The electric heaters are locked out during flush cycle. |
Single Service Transformer7 | N/A Two of these options are supplied standard in all double stack steam generators; the Transformer steps down the primary high voltage supplied for the heaters, in order to provide 120VAC 1Ø for the controls; with this option, only the two (2) primary high voltage supplies are required. |
Manual Low Water Reset8 | N/A Manual Low Water Reset trips if the electric heaters shut-off because of a low water condition. Reset must be manually pressed to resume steam production. |
Water Feed Booster Pump |
N/A Two Water Feed Booster Pumps are supplied standard in all high-pressure double stack steam generators. Each Water Feed Booster Pump increases the incoming water pressure to overcome the operating pressure of each steam generator. Each Booster Pump requires a 5-150 psi water supply with a minimum flow rate of 3 gpm (At least 6 gpm is required for both) |
Spare Parts Package Includes |
N/A
|
5-Micron Water Filter |
N/A 2-stage, 5-micron water filter installed into incoming water line to reduce sediment, dirt, rust, chlorine, and even odor from incoming water supply. |