Standard Features:
  • With the exception of our hawk series, all of our steam generators are built by an ASME Certificate holder in accordance with ASME BPVC Section I – Rules for Construction of Power Boilers (“ASME BPVC Section I”).  They also comply with the requirements outlined in The National Board Synopsis of Boiler and Pressure Vessel Laws, Rules and Regulations (NB-370) RULES FOR CONSTRUCTION AND STAMPING section, which for many jurisdictions include but are not limited to ASME BPVC Section I, ASME CSD-1, ASME B31.1, and REGISTRATION WITH THE NATIONAL BOARD.
  • High Pressure Safety Reset
  • UL Listed and labeled under UL 834
  • Dual Pressure Controls (UL 353)
  • Low Level Cut-Off (LLCO) (UL 353)
  • Safety Relief Valve possessing the ASME V Mark (these valves are built by a manufacturer holding a valid ASME Certificate of Authorization)

Recommended Options (Non-Standard):
  • Spare Parts Package
  • Motorized Automatic Flush & Drain (MAFD)
  • Single Service Transformer
  • 5-Micron Water Filter
LG 10-40 Electric Steam Generators
Unit of Measure
Items LG 10-40 Electric Steam Generators
LG-10 (H)
10 Kilowatt (kW) Rating High Pressure Electric Steam Generator
LG 10-40 Electric Steam Generators
LG-15 (H)
15 Kilowatt (kW) Rating High Pressure Electric Steam Generator
LG 10-40 Electric Steam Generators
LG-20 (H)
20 Kilowatt (kW) Rating High Pressure Electric Steam Generator
LG 10-40 Electric Steam Generators
LG-25 (H)
25 Kilowatt (kW) Rating High Pressure Electric Steam Generator
LG 10-40 Electric Steam Generators
LG-30 (H)
30 Kilowatt (kW) Rating High Pressure Electric Steam Generator
Description N/A Standard Features:
  • With the exception of our hawk series, all of our steam generators are built by an ASME Certificate holder in accordance with ASME BPVC Section I – Rules for Construction of Power Boilers (“ASME BPVC Section I”).  They also comply with the requirements outlined in The National Board Synopsis of Boiler and Pressure Vessel Laws, Rules and Regulations (NB-370) RULES FOR CONSTRUCTION AND STAMPING section, which for many jurisdictions include but are not limited to ASME BPVC Section I, ASME CSD-1, ASME B31.1, and REGISTRATION WITH THE NATIONAL BOARD.
  • High Pressure Safety Reset
  • UL Listed and labeled under UL 834
  • Dual Pressure Controls (UL 353)
  • Low Level Cut-Off (LLCO) (UL 353)
  • Safety Relief Valve possessing the ASME V Mark (these valves are built by a manufacturer holding a valid ASME Certificate of Authorization)
Recommended Options (Non-Standard):
  • Spare Parts Package
  • Motorized Automatic Flush & Drain (MAFD)
  • Single Service Transformer
  • 5-Micron Water Filter
Click here to read the NB-370 synopsis.

"
N/A Standard Features:
  • With the exception of our hawk series, all of our steam generators are built by an ASME Certificate holder in accordance with ASME BPVC Section I – Rules for Construction of Power Boilers (“ASME BPVC Section I”).  They also comply with the requirements outlined in The National Board Synopsis of Boiler and Pressure Vessel Laws, Rules and Regulations (NB-370) RULES FOR CONSTRUCTION AND STAMPING section, which for many jurisdictions include but are not limited to ASME BPVC Section I, ASME CSD-1, ASME B31.1, and REGISTRATION WITH THE NATIONAL BOARD.
  • High Pressure Safety Reset
  • UL Listed and labeled under UL 834
  • Dual Pressure Controls (UL 353)
  • Low Level Cut-Off (LLCO) (UL 353)
  • Safety Relief Valve possessing the ASME V Mark (these valves are built by a manufacturer holding a valid ASME Certificate of Authorization)
Recommended Options (Non-Standard):
  • Spare Parts Package
  • Motorized Automatic Flush & Drain (MAFD)
  • Single Service Transformer
  • 5-Micron Water Filter
Click here to read the NB-370 synopsis.

"
N/A Standard Features:
  • With the exception of our hawk series, all of our steam generators are built by an ASME Certificate holder in accordance with ASME BPVC Section I – Rules for Construction of Power Boilers (“ASME BPVC Section I”).  They also comply with the requirements outlined in The National Board Synopsis of Boiler and Pressure Vessel Laws, Rules and Regulations (NB-370) RULES FOR CONSTRUCTION AND STAMPING section, which for many jurisdictions include but are not limited to ASME BPVC Section I, ASME CSD-1, ASME B31.1, and REGISTRATION WITH THE NATIONAL BOARD.
  • UL Listed and labeled under UL 834
  • Dual Pressure Controls (UL 353)
  • Low Level Cut-Off (LLCO) (UL 353)
  • Safety Relief Valve possessing the ASME V Mark (these valves are built by a manufacturer holding a valid ASME Certificate of Authorization)
Recommended Options (Non-Standard):
  • Spare Parts Package
  • Motorized Automatic Flush & Drain (MAFD)
  • Single Service Transformer
  • 5-Micron Water Filter
Click here to read the NB-370 synopsis.

"
N/A Standard Features:
  • With the exception of our hawk series, all of our steam generators are built by an ASME Certificate holder in accordance with ASME BPVC Section I – Rules for Construction of Power Boilers (“ASME BPVC Section I”).  They also comply with the requirements outlined in The National Board Synopsis of Boiler and Pressure Vessel Laws, Rules and Regulations (NB-370) RULES FOR CONSTRUCTION AND STAMPING section, which for many jurisdictions include but are not limited to ASME BPVC Section I, ASME CSD-1, ASME B31.1, and REGISTRATION WITH THE NATIONAL BOARD.
  • High Pressure Safety Reset
  • UL Listed and labeled under UL 834
  • Dual Pressure Controls (UL 353)
  • Low Level Cut-Off (LLCO) (UL 353)
  • Safety Relief Valve possessing the ASME V Mark (these valves are built by a manufacturer holding a valid ASME Certificate of Authorization)
Recommended Options (Non-Standard):
  • Spare Parts Package
  • Motorized Automatic Flush & Drain (MAFD)
  • Single Service Transformer
  • 5-Micron Water Filter
Click here to read the NB-370 synopsis.

"
N/A Standard Features:
  • With the exception of our hawk series, all of our steam generators are built by an ASME Certificate holder in accordance with ASME BPVC Section I – Rules for Construction of Power Boilers (“ASME BPVC Section I”).  They also comply with the requirements outlined in The National Board Synopsis of Boiler and Pressure Vessel Laws, Rules and Regulations (NB-370) RULES FOR CONSTRUCTION AND STAMPING section, which for many jurisdictions include but are not limited to ASME BPVC Section I, ASME CSD-1, ASME B31.1, and REGISTRATION WITH THE NATIONAL BOARD.
  • High Pressure Safety Reset
  • UL Listed and labeled under UL 834
  • Dual Pressure Controls (UL 353)
  • Low Level Cut-Off (LLCO) (UL 353)
  • Safety Relief Valve possessing the ASME V Mark (these valves are built by a manufacturer holding a valid ASME Certificate of Authorization)
Recommended Options (Non-Standard):
  • Spare Parts Package
  • Motorized Automatic Flush & Drain (MAFD)
  • Single Service Transformer
  • 5-Micron Water Filter
Click here to read the NB-370 synopsis.

"
Brands N/A Electro-Steam™
Variant N/A High Pressure
Electrical Power N/A 10 kW N/A 15 kW N/A 20 kW N/A 25 kW N/A 30 kW
Power Supply Voltage1 N/A 208 VAC230 VAC380 VAC415 VAC440 VAC480 VAC600 VAC
Phase2 N/A 3
Frequency N/A 50 Hz60 Hz
Boiler Horse Power N/A 1 bhp N/A 1.5 bhp N/A 2 bhp N/A 2.5 bhp N/A 3.0 bhp
Steam Capacity3 N/A 34.5 lb/hr15.65 kg/hr N/A 51.75 lb/hr23.47 kg/hr N/A 69.00 lb/hr31.30 kg/hr N/A 86.25 lb/hr39.12 kg/hr N/A 103.5 lb/hr46.95 kg/hr
Water Consumption N/A 4.13 gal/hr15.65 L/hr N/A 6.20 gal/hr23.47 L/hr N/A 8.27 gal/hr31.30 L/hr N/A 10.34 gal/hr39.12 L/hr N/A 12.4 gal/hr46.95 L/hr
Gross British Thermal Units (BTU) Output N/A 33,475 Btu/hr N/A 50,213 Btu/hr N/A 66,951 Btu/hr N/A 83,688 Btu/hr N/A 100,426 Btu/hr
Maximum Boiler Pressure N/A 100 psi
Operating Pressure (Factory Set at 11 Pound per Square Inch (psi)) N/A
Operating Pressure (Factory Set at 80 Pound per Square Inch (psi)) N/A 0 to 80 psi
Maximum Boiler Capacity N/A 6 gal
Boiler Fill Capacity N/A 4.2 gal
Boiler Material 4 N/A Carbon Steel
Cabinet Material N/A 304 Stainless Steel
Plumbing Material N/A Brass (Schedule 40) Carbon Steel (Schedule 40)
Industry Standards N/A American Society of Mechanical Engineers (ASME) - Boiler and Pressure Vessel Code American Society of Mechanical Engineers (ASME) - CSD-1 Canadian Underwriters Laboratories (cUL) Underwriters Laboratories (UL) 834
Amperage at 208 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) N/A 27.70 A N/A 41.60 A N/A 55.40 A N/A 69.40 A N/A 83.30 A
Amperage at 240 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) N/A 26.20 A N/A 39.30 A N/A 52.30 A N/A 65.50 A N/A 78.60 A
Amperage at 380 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) N/A 15.20 A N/A 22.80 A N/A 30.30 A N/A 38.00 A N/A 45.60 A
Amperage at 415 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) N/A 13.90 A N/A 20.90 A N/A 27.80 A N/A 34.80 A N/A 41.70 A
Amperage at 440 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) N/A 13.10 A N/A 19.70 A N/A 26.20 A N/A 32.80 A N/A 39.40 A
Amperage at 480 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) N/A 12.00 A N/A 18.00 A N/A 24.00 A N/A 30.10 A N/A 36.10 A
Amperage at 600 Volt (V) Alternating Current (AC) Voltage (3Ø Phase) N/A 9.60 A N/A 14.40 A N/A 19.20 A N/A 24.00 A N/A 28.90 A
Overall Height N/A 23 in
Overall Length N/A 27 in
Width (No Options Included) N/A 21 in
Width (Motorized Automatic Flush and Drain (MAFD) Option Included) N/A 26 in
Width (Single Service Transformer Option Included) N/A 26 in
Width (Motorized Automatic Flush and Drain (MAFD) & Single Service Transformer Options Both Included) N/A 31 in
Total Height N/A 31 in
Total Length N/A 49 in
Total Width N/A 42 in
Water Inlet N/A 3/8" NPT (National Pipe Thread) (Female) - Y-Strainer, Brass
Steam Outlet N/A 1/2" NPT (National Pipe Thread) (Female) - Ball Valve, Brass
Safety Valve N/A 3/4" NPT (National Pipe Thread) (Female) - Safety Valve, Brass
Drain N/A 3/4" National Pipe Thread (NPT) (Female) - Ball Valve, Brass
Additional Drain (Motorized Automatic Flush and Drain (MAFD) Option Included) N/A 3/4" NPT (National Pipe Thread) (Female) - Motorized Valve, Brass
Steam Solenoid (Steam Outlet) N/A
Temperature Control (Thermostat) N/A
Diffuser Nozzle N/A
Spare Parts Package Includes N/A
  • 18-Month Warranty (12-Month Standard)
  • (2) Electric Heaters and (2) Heater Gaskets
  • (2) Sight Glass Tubes and (4) Washers
  • (1) Pressure Control
  • (1) Contactor
Motorized Automatic Flush and Drain (MAFD) N/A During Start-Up before steam pressure is accumulated, the Motorized Automatic Flush and Drain option cycles fresh water through the boiler for 0-300 seconds (Factory set for 180 seconds or three (3) minutes). As old water is drained out, fresh water will be cycled in. This drain valve will not open if boiler pressure exceeds 5 psi, and the electric heaters are locked out during flush cycle.
Single Service Transformer N/A Supplied standard with all portable steam generators, the Single Service Transformer steps down the primary high voltage to provide 120 VAC Single Phase (1Ø) to the controls; with this option, only the one (1) primary high voltage supply is required.
5-Micron Water Filter N/A 2-stage, 5-micron water filter installed into incoming water line to reduce sediment, dirt, rust, chlorine, and even odor from incoming water supply.
Manual Low Water Reset5 N/A Manual Low Water Reset trips if the electric heaters shut-off because of a low water condition. Reset must be manually pressed to resume steam production.
Portable Mounting Includes N/A
  • Wheels
  • Push Handle
  • Single Service Transformer Option
Water Feed Booster Pump N/A Supplied standard on any steam generator with an operating pressure higher than 15 psi. The Water Feed Booster Pump increases your incoming water pressure to overcome the operating pressure of the steam generator. The Pump requires a 5-80 psi water supply with a minimum flow rate of 2 gpm.
Dual Room Controls N/A
  • 1 Each Electro-Steam™ electric steam generator requires two (2) power supplies: One (1) primary high voltage supply and one (1) secondary 120 VAC 1Ø, 50/60 Hz supply. Each generator is custom built to accommodate only one (1) customer specific high voltage supply for the heaters. 120 VAC 1Ø, 50/60 Hz must also be supplied for the controls, unless the Single Service Transformer option is added.
  • 2 Three Phase (3Ø) primary high voltage is standard, but steam generators with a power rating of 30kW or lower are also available in Single Phase (1Ø) upon request.
  • 3 Calculations are based off of a 212 °F boiler feed-water temperature. Boiler feed-water temperatures that range between 60 °F and 140 °F, are approximately 80% to 90% of the calculated values shown. Boiler feed-water must not exceed 140 °F.
  • 4 Wetted Surface.
  • 5 Manual Low Water Reset is supplied standard with every boiler, but it is not hooked up. If this reset is required as per your local boiler codes, simply plug the two attached wires into the PC-Board terminals labeled "Reset".